Skip to content

Build

A live GTM engine in your stack, from 30 days.

We build your signals, lists, CRM workflows and outbound into one engine, documented as we build it, so your team can run it when we step back.

Book a call

Build sprints from 30 days, with scope and end date agreed up front.

Example sprint: 30 days, then 30 days of fixes

Example sprint: plug in by day 3, design signed off by day 14, live and handed over at day 30, then 30 days of small fixes to day 60.

For teams with sellers but no system behind them

  • Founders with sellers and no system
  • RevOps and GTM engineering leads
  • Heads of sales who will run it in-house
  • The tools are bought, and nothing connects

    A CRM, a data tool and a sequencer, each paid for, each doing one job, and only the person who set them up knows how they fit.

  • “We can build that ourselves”

    Often true, given a quarter. Meanwhile your sellers research accounts by hand and the first workflow is still a draft.

Not a fit if nobody on your team sells full time yet: an engine needs people to run it. Run runs it for you.

What a sprint builds, in order

Before kickoff you sign off what we build, who builds it, the end date and what done looks like. Then the sprint runs in four stages.

  1. Day 3Plug in

    Access to your CRM, inboxes and data, then a stack audit: duplicates, stale fields and where leads leak.

    From youAdmin access, and the person who will own the engine.

  2. Day 14Design

    Your won and lost deals enriched, the tier field set from them, the signals worth tracking and a one-page design per workflow.

    From youAn hour with your top seller, and sign-off on each design.

  3. Day 30Build and go live

    Workflows go live one at a time on your data, each checked before the next.

    From youFeedback from the people who use it each week.

  4. End of sprintHand over

    The playbook walked through with your team, and a runbook per workflow.

    From youYour owner runs each workflow once without us.

A live GTM engine, documented for your team.

What you keep when the sprint ends

The engine keeps running in your accounts, ours or a mix (your choice), and the playbook that explains it is yours to use.
Engine
The workflows, live on your data and in the accounts you chose.
Playbook
Sources and searches, scoring rules, sequences and copy, and your CRM setup.
Runbooks
One per workflow, with how to pause, fix and run it again.
Session
A recorded walkthrough with the person who owns it.
Fixes
30 days of small fixes after the handover.

The engine, playbook, lists, copy and records are yours to use. Our templates and methods stay ours.

Your team runs it without us, and calls us only if it wants more.

One sprint, shaped by the service

GTM Systems
The core of the service. Signals, enrichment, the scored market and the CRM workflows your sellers start the day on. GTM Systems and Engineering
AI
From three live workflows a sprint, each run beside the person who did the work for two to three weeks before it runs alone. AI Transformation
Lead Generation
Lists, sending domains and sequences, set up and documented so your own team sends them. Lead Generation
Inside Run
Lead Generation and Outsourced Sales start with the same setup in Run’s first 30 days, so you can skip the sprint and start at Run.

Start with one sprint. Add another when the roadmap says so.

An engine we built for ourselves

14,400+subscribers and followers

GTM Systems and Engineering, our own build

Eoghan O'Connor

Co-founder, irish insights

Read the irish insights case study

The same engine runs on our own newsletter every week.

Buy a roadmap, a build or a team that runs it

  • Diagnose

    Fixed scope: from 5 days

    Scored audit report and a roadmap you keep.

  • Build

    Sprint: from 30 days

    A live GTM engine, documented for your team.

  • Run

    Retainer: 90 days, then month to month

    Qualified meetings in your calendar and a weekly pipeline report. If you want our team to run it after the sprint.

Start anywhere. Most clients start with Diagnose.

Before you book a call

The scope. Before kickoff we agree what the sprint builds, who builds it and the end date, and both stay fixed. A sprint is never shorter than 30 days: that is how long it takes to plug in, design with your team and put each workflow live on real data. More workflows, more days.

Want our team to run it after the sprint? Here is how Run works.

Sellers waiting on a system? Build it in 30 days.

Book a call

Build sprints from 30 days, with scope and end date agreed up front.